INDUSTRY · SICILY

Sicily blends green hydrogen into the turbine that balances the grid

At Duferco’s site in Giammoro, Hy2Market built a green hydrogen plant with a 1 MW electrolyser beside an existing 58 MW peaker turbine. The plant is designed to blend hydrogen made on site into the turbine’s natural gas at up to 15% by volume, cutting the emissions of the power that covers Italy’s demand peaks. Results from testing the blend are expected in 2027.

Green hydrogenElectrolysisHydrogen blendingPeaker turbineGrid balancingDecarbonisation
Duferco’s green hydrogen plant beside the 58 MW peaker turbine · Giammoro, Sicily · Photo: Duferco Engineering
1 MW
alkaline electrolyser supplied by De Nora
up to 15%
green hydrogen blended into the turbine’s natural gas, by volume
58 MW
peaker turbine balancing the Italian power grid
PROJECT PARTNERS
CNR-ITAE — Coordinator · Sicily pilot, modelling and system design

The Institute of Advanced Energy Technologies “Nicola Giordano” of Italy’s National Research Council coordinated the Sicily pilot and led Hy2Market’s work on green hydrogen production. Its team designed the plant with the industrial partners, modelled how it operates — including the effect of a hydrogen blend on the turbine’s emissions — and prepared the test protocol.

Duferco — Site owner · Giammoro plant and peaker turbine

Duferco owns the Giammoro site and the 58 MW peaker turbine at the centre of the pilot, and hosts the new hydrogen plant beside it. The turbine is called into operation by Terna, the operator of Italy’s electricity grid, to balance supply and demand.

De Nora — Electrolyser supplier

De Nora supplied the pilot’s 1 MW Dragonfly® alkaline electrolyser as a complete containerised system, built and factory-tested at its facility in Milan.

Power Evolution — Compression, storage & control (SCADA)

Power Evolution, a Sicilian engineering company, designed and installed the hydrogen compression and storage that connect the electrolyser to the turbine, and the SCADA system for control and automation of the entire pilot.

Snam — Natural gas network

Snam, Italy’s gas transmission system operator, supplies the natural gas into which the hydrogen is blended.

Summit Engineering — Value-chain modelling · Northern Netherlands

Summit Engineering, based in Groningen, built an energy-system model of the Sicily pilot — electrolyser, storage and peaker turbine — working alongside CNR-ITAE and DEMCON so that results from different models could be compared.

DEMCON — Value-chain modelling · Netherlands

DEMCON modelled the hydrogen value chain with CNR-ITAE and Summit Engineering, testing scenarios for renewable energy availability and electricity prices in Italy, Spain and the Netherlands.

THE CHALLENGE

Peaker turbines keep the lights on when demand spikes: Terna, the operator of Italy’s electricity grid, calls the Giammoro turbine into operation for one to two hours a day. It burns natural gas. Green hydrogen could lower those emissions, but it costs several times more than hydrogen made from natural gas, and transporting it adds to the bill.

THE INNOVATION

A complete hydrogen chain on one site. A 1 MW alkaline electrolyser runs on renewable electricity supplied by Duferco Energia (documented through Guarantees of Origin); the hydrogen is compressed, stored at 200 bar and blended into the turbine’s natural gas at up to 15% by volume. CNR-ITAE coordinated the pilot with Duferco, De Nora, Power Evolution and Snam, with modelling support from Summit Engineering and DEMCON, under the EU’s I3 (Interregional Innovation Investments) Instrument.

THE OUTCOME

Within Hy2Market the partners designed, built and integrated a complete green hydrogen plant beside a working peaker turbine. Modelling carried out in the project indicates that a 15% hydrogen blend can cut carbon monoxide emissions by nearly 30% and CO₂ emissions by around 9% while keeping turbine operation stable, with nitrogen oxide levels expected to hold steady. Results from on-site testing are expected in 2027.

Francesco Sergi, Lead Researcher, CNR-ITAE — on why the Sicily pilot produces hydrogen next to a grid-balancing turbine, and what the modelling predicts.

The region

Giammoro sits on Sicily’s north-east coast, between Milazzo and Messina, on a former steelworks that Duferco is reconverting into an energy and logistics hub. Sicily has some of Italy’s strongest sun and wind, and the island’s south now leads the country in requests to connect new renewable capacity — but as a grid at the edge of the national network, Sicily leans on local plants that can be switched on to keep supply and demand in balance.

Duferco’s gas-fired peaker turbine at Giammoro is one of them: Terna, the operator of Italy’s electricity grid, calls it into operation to steady the Sicilian system. The hydrogen plant is the first in the region to blend green hydrogen into a peaker turbine’s fuel — and part of a wider reconversion of the site, alongside solar, battery storage and a new container terminal, that turns the old steelworks towards clean energy.

Sicily — region map

The opportunity

The pilot was set up to show that green hydrogen can decarbonise peak-time electricity when it is produced and used on the same site — and that an existing gas turbine can take a hydrogen blend without losing stable operation.

Green hydrogen currently costs around €7–9 per kilogram, against roughly €1.50–2 for hydrogen made from natural gas. In Giammoro the hydrogen is not a product to sell: it is produced and consumed on the same site, which takes transport out of the equation and improves the economics. The test programme prepared in the project covers the whole chain — electrolyser, integrated plant and turbine — measuring CO₂ and nitrogen oxide emissions and any change in turbine efficiency on the blend.

STARTING POSITION
100% natural gas
the turbine’s fuel before the pilot
1–2 hours a day
typical running time when the turbine is called on to cover demand peaks

The solutions

Three pieces of hardware and one model turn renewable electricity into lower-carbon peak power. Open each to see the detail.

How it works as one system

How green hydrogen made on site joins the gas supply of a 58 MW peaker turbine. Hover any node to highlight it, click to open the detail.

BRANCHES TO
Electrolyser
1 MW · ~20 kg/h
Makes green hydrogen from renewable electricity and demineralised water.
Hydrogen compressor
200 bar
Raises the hydrogen to storage pressure.
Hydrogen storage
~1 hour at full load
Banks hydrogen between demand peaks, so the electrolyser can run steadily while the turbine runs briefly.
Blending point
up to 15% by volume
Hydrogen joins the natural gas after the metering cabinet — up to about 200 kg an hour at full load.
Fuel compressor
58 bar
Brings the blended fuel up to the turbine’s inlet pressure.
Peaker turbine
58 MW
Burns the blend and sends electricity to the grid when Terna calls it into operation.
Renewable electricity & water
Duferco Energia + on-site well
Duferco Energia supplies the electricity through the industrial site’s network — 100% renewable for the test campaign, documented through Guarantees of Origin; an on-site well supplies the water.
Snam gas network
14–24 bar
Natural gas arrives from Snam’s network through a fiscal metering cabinet and remains at least 85% of the fuel.
Stack
emissions measured
Testing measures CO₂, carbon monoxide and nitrogen oxides in the exhaust.

The process

Lessons learned

Before the plant has even run, the lessons are about getting there: model before you build, and start permitting early.

  • Permitting sets the pace — Italy’s integrated environmental authorisation became the critical path: the plant could be built without it but not switched on, and the review ran through rounds of technical questions and meetings with the authorities.
  • Integration reaches every system — bringing hydrogen into an existing industrial site meant coordinating fire protection, fire and gas detection, shutdown logic and medium-voltage electrical infrastructure, alongside the interfaces between production, storage and the turbine.
  • “Hydrogen-ready” is a starting point — even a turbine rated hydrogen-ready needed some retrofit and a re-tuned control system to take a 15% blend.
  • Model before investing — modelling gave an early answer on emissions, pointing to no increase in nitrogen oxides, and tested the system under different electricity prices and renewable supply before the plant was built.
  • Make it where you use it — producing hydrogen on the site that consumes it avoids transport and gives green hydrogen a more realistic business case than buying it in.
  • A step up in scale — for the Sicilian supply chain, the pilot meant moving from laboratory-scale systems to designing, installing and operating an industrial-scale hydrogen plant.

The outcomes

~30%
modelled cut in carbon monoxide emissions at a 15% hydrogen blend
~9%
modelled cut in CO₂ emissions at a 15% hydrogen blend
Stable
turbine operation maintained in the model, with nitrogen oxides expected to hold steady
~20 kg/h
green hydrogen produced on site (design value)

These are modelled, not measured, figures — the on-site testing campaign begins in 2027 and will replace them. The Sicily pilot’s result within Hy2Market is the plant itself: a full hydrogen chain designed, built and integrated next to a working power turbine, taking the integrated plant from TRL 6 to TRL 7 — a system prototype demonstrated in a real operational environment. The modelling points to meaningful emission cuts at a 15% blend without destabilising the turbine, and testing will show how closely the plant matches the model.

Knowledge exchange

Sicily’s pilot was shaped with partners in other Hy2Market regions. Its hydrogen value chain was modelled together with engineering partners in the Netherlands, and the approach is built to travel: change the electricity market, the renewable resource and the industrial use, and it can test the feasibility of a hydrogen project elsewhere in Europe.

⇄
WORKING WITH
Northern Netherlands · Netherlands

Summit Engineering in Groningen modelled the Sicily plant alongside CNR-ITAE and DEMCON, with weekly working sessions to compare results. Running more than one model on the same plant let the partners check one another’s findings before the investment was made.

⇄
POOLED ACROSS HY2MARKET
Hy2L decision-support tool

CNR-ITAE developed Hy2L within Hy2Market: a decision-support tool for designing and assessing green-hydrogen plants. From hourly energy prices, renewable profiles and hydrogen demand, it sizes the plant’s components and optimises their hour-by-hour operation for the lowest levelised cost of hydrogen (LCOH) — drawing on the project’s industrial cases, Sicily among them.

IN THEIR WORDS

For Sicily, this project is more than a mere hydrogen plant development. It is a blueprint showing how renewable electricity, hydrogen production, storage and power generation work together to support both regional development and European decarbonisation goals.
Francesco Sergi
Lead Researcher · CNR-ITAE